One of the largest industries in the food sector, OHONOS SNACK, tructed us with the construction and installation of the natural gas network for industrial use of a total power of 17,355 kW and a total supply of 1,735m3 / h.
The project concerns the supply of the old factory and the production line as well as the large expansion of the industry with new oil boilers, which are condensing. The form of the construction concerned a 250m Φ160 polyethylene network including the excavation and the restoration with asphalt. The supply of the two separate points – the old and the new building installations – was carried out with an 8” central collector and for each device a separate mount was created.
The project was successfully completed according to the timescale given.