Miraggio Thermal Spa Resort is a dream destination, on the southwest coast of Kassandra, in Halkidiki.
Miraggio trusted our many years of expertise in the field when it needed to supply its three kitchens with a gas network. The construction of a gas network for the supply of the boiler room and the spa facilities was also carried out. The project was completed in one (1) month with absolute success.
LPG tank: 10,000L
Installation spaces:
- Central kitchen with 24 appliances
- Ala cart kitchen with 8 appliances
- Beach bar kitchen with 8 appliances
- Central boiler room with 3 boilers of a total power of 3,400kw
- Spa facilities boiler room with two boilers of a total power of 200 kw
Internal operating pressure 50mba